Synopsis
500 million cubic meters of sand and soil have been transported globally to double the width and deepen the main waterway of the Suez Canal.
Synopsis
Construction crews work tirelessly along the Suez Canal, a vital waterway in Egypt. The project aims to double the canal's width and deepen its main channel. So far, 500 million cubic meters of sand and soil have been moved from various locations worldwide. Advanced 3D images illustrate the methods used to expand this crucial maritime route. The documentary details the engineering challenges and the scale of this ambitious endeavor, which began in 2016.
Deep Dive
Why Watch
- See the unprecedented 3D images of the Suez Canal expansion.
- Find out how 500 million cubic meters of material were moved.
- Meet the engineering challenges of widening a major waterway.
Did You Know
- 500 million cubic meters of sand and soil have been transported for the project.
- The documentary was released in 2016 and has a duration of 53 minutes.
- The project aims to double the width of the Suez Canal.
Perfect For
Frequently Asked Questions
What is the goal of the Suez Canal construction project?
The goal is to double the width of the Suez Canal and deepen its main waterway.
How much material has been transported for the Suez Canal project?
500 million cubic meters of sand and soil have been transported from all over the world.
What technology was used to reveal the construction process of the Suez Canal?
Unprecedented 3D images were used to reveal how the canal was widened.
What are people saying?
Play More Like This
Where else to watch
Browse more like this
Related Films
Is this your film?
If you made this film or hold the rights to it, we'd like to talk. We can license it and pay you a share of what it earns.





















Comments